Unigas PN30 Installation Manual Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
PART I: INSTALLATION MANUAL8
HYDRAULIC DIAGRAMS 3ID0010 E 3ID0012 - Complete key
1 Oil storage tank
2 Foot valve
3 Oil storage tank pre-heating coils (1)
4 Oil circuit filter (1 mm mesh)
5 Circuit pressure regulator
6 Pressure gauge scale 0 - 10 bars
7 Pressure regulator by-pass valve (5)
8 Gate valve
9 Oil circuit pressure regulator pump
10 Pump pressure regulator (9)
11 One-way valve
12 Oil buffer tank pre-heater (19)
13 Oil buffer tank thermostat
14 Burner enabling thermostat
15 Thermometer scale 0 - 90° C
16 Oil buffer tank heater enabling pressure switch
17 Oil buffer tank pre-heating coil (19)
18 Oil buffer tank air vent valve
19 Oil buffer tank, capacity 600 l approx.
20 Oil filter (0.3 mm mesh)
21 Fuel cutoff solenoid valve
22 Fuel gate valve
23 Burner pump hoses (24)
24 Burner oil pump
25 Pre-heating tank resistor
26 Pre-heating tank
27 Oil enabling thermostat TCN (26)
28 Pre-heating tank resistor safety thermostat TRS (26)
29 Oil temperature regulator thermostat TN (26)
30 Pre-heating tank (26) filter (0.1 mm mesh)
31 Thermometer 0 - 200° C
32 Check valve, opening 3.5 - 6 bars
33 Solenoid valve EVN1
37 Ignition enabling thermostat TCI
42 Burner enabling thermostat
43 Burner
45 Coils and tubes pre-heating pumps thermostat
46 Oil buffer tank pre-heating water pump (19)
47 Oil storage tank pre-heating water pump (1)
48 Pre-heating water balance calibration valves
50 Oil pump (diagram 3ID0012 only)
52 Maximum circuit pressure switch (if present)
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 31 32

Comments to this Manuals

No comments